University of Illinois at Urbana-Champaign, Krannert Center and Noyes Lab

Urbana-Champaign, IL

UIUC, Foellinger Great Hall at the Krannert Center for Performing Arts

Overview

The project replaced electrical service for the Krannert Center’s Foellinger Great Hall and the Noyes Lab substation.

The 300,000-square-foot Krannert Center for the Performing Arts, which opened in 1969, is a home for theatre, dance, and music performances. It includes five indoor stages as well an outdoor amphitheatre.

Noyes Laboratory was built in 1902 and expanded in 1916, encompassing about 165,000 square feet, total. The longtime home of the university’s chemistry department, it has been continually updated for more than 100 years.

Electrical Upgrades | Engineering Design

The 47-year-old electrical substation serving Foellinger Great Hall at the Krannert Center for Performing Arts was at the end of its useful life, and the electrical room didn’t meet current access, egress, and clearance requirements.

Noyes Lab’s substation was beyond its useful life. The electrical room had water ingress issues, and the installation didn’t meet current egress and clearance requirements.

The university combined these two upgrades and different buildings into a single capital improvement project.

GBA developed a design for replacement and relocation of the service entrance substation at the Krannert Center. The new service utilized a pad-mounted transformer and a new electrical room with improved access. Equipment included a 13.8 kV primary service (but configured to accommodate a future 12.47 kV feed) and appropriate secondary service. The project was phased to minimize downtime.

The replacement substation at Noyes Lab was moved into a separate two-hour room, including new lighting, fire alarm devices, and convenience receptacles. Equipment included a new 480V substation and associated equipment. A new roof was installed over the prior electrical room to prevent water infiltration. As with the Great Hall project, phasing was completed to minimize impact on building operations.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.