U.S. General Services Administration, Everett McKinley Dirksen U.S. Courthouse

Chicago, IL

Dirksen Courthouse, entrance

Overview

GBA performed an engineering study followed by an upgrade design project involving electrical infrastructure motor control centers (MCC) at the Everett McKinley Dirksen U.S. Courthouse, which is part of the Federal Center Plaza complex, located in Chicago’s downtown Loop area. Completed in 1964, this historic Mies van der Rohe designed, 30-story structure houses U.S. District and Bankruptcy courts, and other court-related tenants.

Motor Control Centers Upgrade, Analysis and Design

GBA undertook this project to review the existing electrical infrastructure motor control centers (MCC) in the Dirksen Federal Building to investigate whether repair, replacement, and/or redesign was warranted to better serve connected loads.

GBA reviewed, in detail, all available drawings, updated equipment lists, analyzed loads, and conducted a field survey to understand the uses of the existing 14 MCCs.

  • A dozen of the existing MCCs appeared to be original to the building; however, most of the starters had been removed as major equipment loads were migrated to variable frequency drives. This left the MCCs to function as panelboards providing overcurrent protection and a means of disconnecting equipment loads—not a cost- or space-efficient use of the equipment.
  • After review of each motor control center, GBA recommended replacing the MCC or maintaining it. The engineers reviewed several factors before providing recommendations, including age of equipment, expected service life, past operating and/or code issues, connected loads, and feasibility.
  • Accompanying the recommendations were order-of-magnitude costs for replacements, as applicable.
  • For the most part, GBA recommended replacing existing MCCs with distribution panels and freestanding combination H-O-A starters.
  • The report recommended project phasing and weekend installations to accommodate building operations and to respect the critical nature of the building.
  • The study was followed with a design project.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.