Hyatt Regency Miami

Miami, FL

Chiller plant with equipment, Hyatt Regency Miami.

Overview

The Hyatt Regency Miami is a 459,570-square-foot hotel with 612 rooms, located in the heart of downtown Miami. The purpose of the project was to replace the hotel’s chilled water plant. Three centrifugal chillers, condenser and chilled water pumps, chilled water source heat pump water heater and tower were replaced, and a 6,000-gallon domestic hot water storage tank relined. The new plant has a total cooling capacity of 1,945 tons, representing an increase in capacity of 18% (279 tons).

Chilled Water Plant Replacement, Design

Three centrifugal chillers, condenser and chilled water pumps, a chilled water source heat pump, a water heater, and a cooling tower were replaced and a 6,000-gallon domestic hot water storage tank relined.

The plant was kept operational during construction by replacing one chiller at a time and installing the new cooling tower in a different roof location so the existing tower could remain operational. Equipment was pre-purchased based on life cycle cost analysis, including first cost, refrigeration energy, pump energy, and maintenance costs.

The project improved performance of the heat pump domestic water heating system, resulting in an increase from 120°F to 135°F supply water temperature.

Control features include:

  • Condenser water temperature reset based on ambient wet bulb.
  • Condenser water flow reset based on the number of active chillers.
  • Variable secondary chilled water distribution.
  • Use of domestic water heat pump based on time-of-day, laundry operation, and domestic water flow.
  • Continuous calculation of plant operating efficiency (hourly, daily, weekly, and monthly, kW/ton).
  • Variable speed drives on all major pumps.

The heat pump produces heat at $3.685 per million Btu compared to natural gas at $7.50 per million Btu (based on 60 cents/therm and 80% conversion efficiency).

Plant full-load efficiency, including the cooling tower, chilled and condenser water pumps, and chillers, is 0.746 kW/ton. Reductions in monthly building electric demand as high as 546 kW were realized.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.