UChicago Medicine, Cyclotron and Cancer Imaging

Chicago, IL

Cyclotron.

Overview

GBA provided commissioning services at a 9,500-square-foot cyclotron and imaging facility in the sub-basement of the existing Mitchell Hospital. Commissioning of the sophisticated scientific and medical facility included HVAC, exhaust, chilled water, hot water, tempered water, compressed air, vacuum, piped gas, hydrogen leak monitoring/alarm, and automatic door systems.

Commissioning

In the late 1960s, the University of Chicago created one of the nation’s first cyclotrons owned by an academic facility. The equipment was decommissioned in 1997. The University recently developed a new cyclotron to advance work in metabolic imaging. The facility produces radioactive isotopes for injectable drugs, which are tracked in the body by PET imaging equipment. The imaging produces valuable information on the behavior of diseases in the body. The 9,500-square-foot facility contains the 18-MeV cyclotron; four cGMP cleanrooms; and a small-animal imaging facility. A quality commissioning process is an important factor in getting the facility qualified per FDA requirements for producing radiopharmaceuticals.

GBA was hired late in the construction process, but a review of the design documents identified numerous concerns with the design sequences and with the user’s requirements not being met. Issues included the following:

  • Incorrect fan control strategy (paired Strobic fans should be on simultaneously for the critical lab).
  • The pharmacy requires 68°F space temperatures. The design called for resetting AHU SAT, which would have prevented this from being achievable.
  • The AHU supply airflow control strategy conflicted with the VAV box operation.
  • Locations of AHU smoke detectors did not meet requirements of NFPA and IDPH.

During the first commissioning kick-off meeting, the G/BA team identified a potential problem with an AHU configuration that would have caused nuisance low-temperature unit trips during cold weather.

GBA performed temperature profile testing while mocking up outside/return air blenders in cardboard. The team was able to show much improved air mixing through blender placement. As a result, the design team provided a formal sketch of the configuration, matching GBA’s mock-up, which was later installed.

GBA reviewed the air-side balancing report, and, after discussions with the TAB technician, the engineers concluded that one of the AHUs serving the space had been selected with a fan motor that was too small. As a result of the review, a larger motor was installed; unit capacity was increased; and correct space pressurization was achieved.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.