The University of Chicago Medicine is housed in a 24-building medical and research campus (6.22 million square feet), including two independent chilled water systems: a 14,500-ton Central Plant (including chilled water production at both the Parking A facility and the Surgery Brain Research Pavilion) and a 7,080-ton plant at the Center for Care and Discovery (CCD). The system also includes 20 chilled water bridges with pumps serving various individual buildings. GBA was retained to investigate and troubleshoot issues regarding system capacity and performance.

Awards

ASHRAE Illinois, Excellence in Engineering Award, 2016

Chilled Water System, Retro-Commissioning

The UCM staff had noted several issues, including insufficient chilled water primary flow (potentially due to undersized piping); insufficient cooling capacity from the Central Plant; insufficient condenser water flow to operate all six chillers at the Parking A site; insufficient cooling at various secondary chilled water bridges; and staging issues at the Center for Care and Discovery’s chilled water plant after installation of a sixth chiller.

  • GBA engineers concluded that Central Plant capacity was adequate and that apparent insufficient capacity was caused by issues at the system’s numerous secondary chilled water bridges, causing higher than designed flow demand. No additional capacity was available for future loads unless the excess bridge flow could be reduced.
  • Some secondary bridges could be fixed with simple control system adjustments, but most were served by legacy controllers, necessitating equipment upgrades.
  • The team recommended adjustments to increase the Parking A plant’s ability to flow water through the chillers, including a cooling tower cell fill replacement.
  • The Parking A condenser water system was discovered to have ample capacity for the flow and heat rejection demand. Issues with cooling towers were instead related to lack of automatic controls and to undersized equalizer piping.
  • The CCD chilled water plant’s apparent staging issues stemmed from problems with AHU economizer modes; staging improvements were implemented.
  • Engineers recommended 11 Facility Improvement Measures, with a combined potential annual electricity savings of 2.3 million kWh ($171,000) and a 5.8-year simple payback. The most impactful measure, upgrading bridge controls, would yield nearly 1 million kWh savings annually, with a simple payback of 5.3 years. Some low- and no-cost measures were implemented immediately.
  • UCM now has a roadmap for creating a more efficient chilled water system.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.