Overview

GBA worked with Amtrak, JLL, WEngineers, and Goettsch Partners to provide new mechanical, electrical and plumbing infrastructure to support the renovation of the 20,000-square-foot Great Hall, as well as future development of the high-rise portion of this iconic Chicago landmark. The $21 million project involved close coordination with the City of Chicago and Chicago Landmarks Commission.

Infrastructure Upgrades

  • An entirely new air conditioning system, consisting of four new air-handling units delivering a total of 110,000 cfm of air, was added to serve the Great Hall.
  • Due to the landmark status of the Great Hall, no ductwork or grilles could be visible. CFD analysis was used to determine the performance of several air distribution schemes. The chosen solution uses the raised floor of two balconies to supply cooling air to the Great Hall.
  • A new 1,000-ton water-cooled chiller plant, cooling towers, and 18,000-MBH heating plant were added to support the Great Hall air conditioning system, Amtrak offices, and future development of the Headhouse.
  • New electrical substations and switchgear (including new electrical utility service) and a new 750-kW emergency generator with provisions for a second generator in the future were added.
  • The generator is providing back-up power for the fire pump, life safety systems, and select mechanical equipment. Due to the building’s architecture, challenges included ventilating the generator room and routing the generator exhaust stack through the building. In addition, available fuel storage was limited to 550 gallons due to fire and building code limitations. A new fuel fill system was integrated with the building’s facade.
  • Domestic water service and sanitary and storm drainage systems were upgraded to support the Union Station Master Plan.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.