Ascension Saint Joseph – Joliet

Joliet, IL

St. Joseph Medical Center-Joliet, exterior

Overview

Saint Joseph Medical Center was built in 1962 in Joliet, IL, and has grown to encompass nearly 1.2 million square feet of facilities, with 480 licensed beds. Areas of concentration include neuroscience, advanced cardiac care, orthopedics, obstetrics, rehabilitation, and a trauma center. The facility was retro-commissioned as part of the ComEd Energy Efficiency Program. The intent was to identify and implement low-cost, short-payback energy conservation measures to improve sustainability and reduce annual operating costs.

Awards

ASHRAE Illinois, Excellence in Engineering Award, 2014

NEXANT RCx Cup Award, Project of the Year, 2014

Retro-Commissioning

During planning and investigation, eight retro-commissioning measures (RCMs) were presented to the hospital. The two measures chosen for priority implementation focused on improving efficiency of 13 air-handling units. ComEd paid 100% of the engineer’s RCx fee, allowing PSJMC to conserve finances for the implementation. Of the eight suggested RCMs, the client selected the two most cost-effective, both of which had a very short simple payback time (0.08 year for eliminating simultaneous heating and cooling and 0.27 year for correcting supply fan controls). The total cost savings resulting from these two measures exceed $330,000/yr ($134,409 for electricity and $205,417 for gas). The client expects to implement more RCMs in future months. If all six remaining RCMs are implemented, annual additional cost savings would be nearly $26,000 for electricity and over $5,700 for natural gas.

  • The majority of the energy savings resulted from reduction of simultaneous heating and cooling that was occurring in four large AHUs. These units were only four years old, but the steam control valves had failed prematurely. The affected AHUs had two steam valves apiece; one was failed open on each of the four units. The cooling valves were compensating for the additional heat, and the unit discharge air temperature was normal. Temperature sensors were not installed downstream of the preheat coil, and the building automation graphics showed the valves were being commanded closed, so the failure was not evident from the controls system.
  • Grumman|Butkus Associates identified the valve failure, concluding that the electrohydraulic steam valve actuators had overheated due to the size of the steam lines and the proximity of large isolation valves. The client implemented the recommended cost-effective solution: replacing actuators and insulating the control valves. The other nine AHUs had less severe issues. Most of these units had pneumatic actuators that needed calibration to drive the valve completely closed when it was commanded to do so.
  • The second implemented measure addressed supply fan speed control. Four VAV air-handling units were operating with the supply fans at constant speeds because of various issues. Failures were identified in a variable frequency drive, a static pressure sensor, a controls electro-pneumatic transducer, and a controls analog-input module. These issues have since been remedied.
  • Six additional RCMs were identified through RCx but have not yet been implemented: installing new chilled water differential pressure sensors to improve chilled water pump control; modifying the economizer control sequence to utilize more outside air for free cooling; implementing static pressure reset control sequences; scheduling an air handling unit that served transiently occupied space; repairing snow/ice sensors that are used to control a snow-melting system; and optimizing the cooling setpoint for one underperforming AHU.
  • Several extra capital measures to reduce energy consumption were also suggested, including: converting the hot water portion of the heating system to variable flow; reducing the airflow for operating rooms based on occupancy schedules; installing variable frequency drives on the boiler burners and kitchen exhaust fans; and converting single-zone air handling units to variable air volume. These suggestions offer guidance for improving the campus’ long-term energy efficiency.

View More Projects

Interested in learning more about how GBA can assist with your facility objectives? Our portfolio is a great place to start. 

Skyscraper board room

430 N. Michigan (Realtor Building)

A large-scale vertical expansion called on GBA's analytical, design, and commissioning skills.

Hallway with rehab equipment

Shirley Ryan AbilityLab, Pediatric & DayRehab Center

This outpatient center serves children and adults; GBA provided engineering design services for the adaptive reuse project.

Exterior of Todd Building, University of Kentucky

University of Kentucky, Lee T. Todd, Jr. Building

An ASHRAE Level 1 audit,  retro-commissioning, and a lab ventilation assessment improved sustainability.