Our Blog

Learn more and stay up to date with our latest posts.

Hospital Energy Costs Up Sharply, New GBA Survey Reveals

Hospital Energy Costs Up Sharply, New GBA Survey Reveals

Grumman|Butkus Associates has released its 2023 Hospital Energy and Water Benchmarking Survey, featuring combined data from calendar years 2021 and 2022. For the first time, the report charts and historical data are available online at a dedicated website, including...

GBA Promotes Two Employees

GBA Promotes Two Employees

GBA's Chicago and New York regional offices promoted Timothy Venturella and Brendan Erskine to Senior Project Engineer at the recent semi-annual meeting. Timothy Venturella joined GBA’s Evanston office in 2023. He graduated with a BA in Public Relations from the...

GBA’s 2023 Sustainability Report Released

GBA’s 2023 Sustainability Report Released

Grumman|Butkus Associates continues documenting its efforts to “walk the walk” of sustainability with the release of its annual Sustainability Report. In 2013, the firm released its first annual corporate sustainability report. We recently completed the eleventh...

How To Develop an Effective Energy Management Project List

How To Develop an Effective Energy Management Project List

At GBA, we love helping clients set up Energy Management Systems. A comprehensive tool is the DOE 50001 Ready Navigator (https://navigator.lbl.gov/). It breaks the ISO 50001 Energy Management standard down into 25 tasks. At a minimum, energy management can be about...

Optimize Transfer Switch Settings To Protect Critical-Use Buildings

Optimize Transfer Switch Settings To Protect Critical-Use Buildings

Do your critical-use buildings have their transfer switch settings optimized? Critical-use buildings—such as hospitals, data centers, prisons, laboratories, and buildings that house industrial processes—utilize generators for backup power. Transfer switches are a...