Publications

Publications

Leveling Up: Using Measurement & Verification to Improve an Office Building (case study on 801 Grand, Des Moines, in High Performing Buildings, Fall 2019 - ASHRAE winner at the Illinois, Region VI, and Society levels)

ComEd Incentives Help Chicago Marriott Complete Chiller Upgrade (case study on infrastructure changes at the Chicago Marriott Downtown Magnificent Mile, in Chief Engineer, December 2018)

Moving On: Cosmetic and Infrastructure Upgrades at the Realtor Building (case study on infrastructure changes at 430 N. Michigan, in Chief Engineer, November 2018)

G/BA Hospital Energy and Water Survey, Part 1 analysis (2018 survey, 2017 data; electricity and fossil fuel usage and costs)

G/BA Hospital Energy and Water Survey, Part 2 analysis (2018 survey, 2017 data; water/sewer, costs per bed, carbon footprint)

Infrastructure Check-Up Leads to Big Benefits (case study on Advocate Illinois Masonic Medical Center's chiller plant update, in Engineered Systems magazine, October 2015)

Plumbing Renovations at NorthShore Skokie Hospital (case study in Plumbing Engineer magazine, March 2015)

How to Get the Most From Your Chilled Water Plant (2014)

Resort Central Plant Renovation (ASHRAE Journal, July 2011)